Milling, boiling house & crystallization
Control systems and electrical infrastructure built around the crushing season, with major work timed to your off-season shutdown.
Automation and electrical engineering for sugar, ethanol & power plants
Auronix designs, installs, and maintains the PLC/DCS control systems and electrical infrastructure that keep sugar mills, ethanol distilleries, and power plants running — with a preventive maintenance program that catches failures before they cost you a shift.
Built around the operating rhythm of each — not a one-size-fits-all playbook.
Control systems and electrical infrastructure built around the crushing season, with major work timed to your off-season shutdown.
DCS and instrumentation for continuous and campaign-based distillery operations, with the redundancy a 24/7 process demands.
Electrical infrastructure and control-room systems for captive and grid-connected plants, including bagasse and biomass cogeneration.
Four disciplines, one goal: no unplanned stoppages during the season.
Design, programming, and migration of PLC and DCS control systems across milling, distillation, and boiler/turbine control.
HT/LT panels, motor control centres, cabling, transformers, and switchgear sized for continuous duty across mills, distilleries, and power plants.
Scheduled inspections, thermal scans, and component health checks that catch wear before it takes down a line.
Field instrumentation and control-room dashboards that give operators a clear, real-time read across sugar, ethanol, and power operations.
A few plants running on systems we built or maintain.
Milling house · DCS migration
Zero downtime during cutover
Legacy relay logic replaced with a fully redundant DCS, migrated loop by loop during a single planned shutdown.
Ethanol distillery · Instrumentation upgrade
40+ points re-instrumented
Fermentation and distillation columns fitted with new flow, level, and temperature instrumentation feeding a unified SCADA.
Power plant · Preventive program
3 failures caught pre-season
Thermal scans and drive diagnostics on turbine and generator control panels flagged a failing bearing and two degraded contactors before start-up.
"Auronix rebuilt our DCS during the off-season and it held through the entire crush without a single unplanned stop. Their maintenance team catches problems weeks before they'd have shut us down."